Galleria Block 5
1245 Dupont Street, Toronto
Developer: ELAD Canada
Units: 634 (150 rental units)
Storeys: 29 & 24
GFA: 539,969 sq.ft.
Completion Date: 2023
Galleria Mall Redevelopment
The redevelopment of the Galleria Mall at the corner of Dufferin and Dupont Street will transform the 20-acre site into a high-rise mixed-use residential community. The phased development will eventually see 8 mixed-used buildings and 2,900 condominium residences, 150 affordable rental housing units and 300,000 sq. ft. of grade-level retail will be incorporated along the newly designed street grid along with an 8-acre park and new community centre designed to activate the public realm.
Stepped and stacked box design
The first phase of the redevelopment of Galleria 01 will pay homage to the areas industrial built form. The 29 storey tower will be clad in dark metal finishes and will feature an articulated stepped and stacked box design. A shared podium will form the connection to Galleria’s phase two tower consisting of 24 storeys.
Retail at grade
Grade-level retail will be incorporated along the newly designed street grid along with a new community centre and streetscape design to activate the public realm. The street-level transition will incorporate double-height retail at grade.
The first phase of the redevelopment of Galleria 01 will pay homage to the areas industrial built form
Consultant Team
GC: Clark Construction Management
Structural: Jablonsky, Ast, and Partners
Mechanical & Electrical: Smith and Andersen
Interior Design: U31
Landscape: NAK Design Strategies